HomeSteel & CommoditiesSteel Bridge launched for Bullet Train Project

Steel Bridge launched for Bullet Train Project

Published on

Thee second 100 m span of 2 X 100 m long steel bridge was successfully launched over NH-48 (connecting Delhi, Mumbai & Chennai) near Nadiad, Gujarat for Mumbai-Ahmedabad Bullet Train project.

The first span of 100 m for this steel bridge was completed in the month of April 2025. This is the ninth steel bridge completed out of the planned 17 steel bridges in Gujarat.

Comprising of two spans of 100 m each, this steel bridge weighs around 2884 metric tons, stands 14.6 meters tall and 14.3 meters wide. Fabricated at the workshop in Salasar, near Hapur, Uttar Pradesh, the steel bridges are designed for a 100 year lifespan.

This 200 m long steel bridge is constructed with approximately 1,14,172 Tor-Shear Type High Strength (TTHS) bolts, C5 system painting, and elastomeric bearings.

spot_img

Latest articles

AMTZ’s Dr Sharma bestowed with gold award

The Qimpro Foundation recently honoured India's most distinguished leaders at the 36th Qimpro Awards,...

GRSE Delivers 120th Warship to Indian Navy

Reinforcing its steady progress in delivering frontline naval platforms, Garden Reach Shipbuilders & Engineers...

Andhra Pradesh’s big data centre bet

For decades, Visakhapatnam’s economy has revolved around its port, steel plant, shipbuilding and industrial...

Coca Cola firms up Rs 1100 crores in AP’s Food Processing Sector

Hindustan Coca-Cola Beverages Private Limited (HCCB), a subsidiary of Hindustan Coca-Cola Holdings Limited recently...